C A S E S T U D Y
Old Marsh Golf Club
Palm Beach County, FL
Elevating the Member Experience: Why Partnership Matters More Than Procurement
As he considered possible future plans for clubhouse renovation, the General Manager at Old Marsh Golf Club faced a smaller—but highly visible—need: upgrading locker room seating without disrupting daily member operations. He treated the project as a real-world “audition” for future partners, looking for proof that a vendor could deliver quality, certainty, and operational continuity when the stakes were real.
That’s when he engaged SHERPA FF&E.
The Stakes - What Could Have Gone Wrong
Old Marsh had already identified and priced a chair. The “easy” path would have been to simply place the order and move on.
But in private club environments, that’s where risk hides.
A chair that looks right on paper can fail under real-world use: heavy traffic, daily cleaning, brand expectations, and member scrutiny. And even if the product is fine, most FF&E procurement models still create operational drag—boxes on a dock, staff pulled into assembly, packaging clutter, and unnecessary disruption in member spaces.
Old Marsh didn’t just need chairs. They needed a result that wouldn’t create downstream problems.
The SHERPA Approach - From Transaction to Outcome
Instead of acting as order-takers, SHERPA treated the request like a performance-and-delivery system.
Design Calibration (Better product, not just “the product”)
SHERPA reviewed the pre-selected chair and guided the club toward custom, commercial-grade options, including upgraded materials and finishes aligned to the Old Marsh aesthetic. This shifted the project from “buying a chair” to engineering a durable design outcome built for a high-traffic locker room environment.Certainty Through Communication + Control
SHERPA maintained proactive updates and set clear expectations—turning a small purchase into a documented proof-of-capability that the GM could trust and defend.White-Glove Execution (Installed means installed)
SHERPA managed delivery into the actual space, placed the seating, and removed packaging—so the club’s staff stayed focused on members, not furniture logistics.
Results - The Outcome Contract
Performance (Better Product)
The final seating solution delivered improved comfort, durability, and brand alignment versus the original pre-selected option—designed for commercial use, not residential wear patterns.
Certainty (Reliable Timeline)
In an industry where “lead times” often drift, SHERPA delivered exactly when promised—giving leadership confidence, not excuses.
Operational Continuity (Zero-Hassle Install)
The install was a non-event operationally. No staff hours burned on unboxing. No disruption. No cleanup burden left behind. The locker room upgrade happened without creating friction for members or staff.
Client Perspective
“As a General Manager, certainty is paramount when managing capital investments, especially during a significant project like a locker room redesign. Glenn and the Sherpa FF&E team not only delivered on our aesthetic design requirements for the project—blending high-end residential appeal with commercial durability—but they also provided financial certainty by significantly lowering our initial cost expectations. The white-glove installation was a testament to their focus preventing interruption to club operations. I highly recommend Sherpa FF&E for their approach to design projects and commitment to delivering confidence to the Board."
Michael Menery - General Manager at Old Marsh Golf Club
Why This Matters for Other Clubs
For premier clubs, the risk isn’t just overspending—it’s operational disruption, product regret, and vendor uncertainty that shows up when timelines tighten. This project proved SHERPA’s role isn’t “procurement.” It’s governed delivery—a system that protects the club’s standards, timeline, and daily operations. Old Marsh now has validated confidence in SHERPA as a partner for larger capital projects already on the horizon.